中文人妻熟女乱又乱精品,亚洲精品一区久久久久一品av,人妻精品久久久久中文字幕,国产办公室秘书无码精品99,国产精品久久久久久久久绿色,日本真人边吃奶边做爽动态图,成人精品一区二区三区电影,成人精品一区二区三区电影,一本色道久久88加勒比—综合,欧美国产亚洲日韩在线二区

How to maintain the medium frequency electric furnace?

2021-11-29 1679

  1. Regularly remove the dust in the power cabinet

  In particular, the outside of the thyristor core shall be wiped clean with alcohol. The frequency conversion equipment in operation generally has a machine room, but the actual working environment is not ideal. In the smelting and forging process, the dust is very large and the vibration is strong. In the diathermal quenching process, the equipment factory is close to the pickling and phosphating equipment, and there are more corrosive gases, which will damage the components of the relevant equipment of the medium frequency electric furnace and reduce the insulation strength of the equipment. When there is a lot of dust, the component surface discharge often occurs. Therefore, it is necessary to pay attention to frequent cleaning to avoid problems;

  2. Regularly check whether the binding of water pipe joint is firm

  When tap water well water is used as the cooling water source of medium frequency electric furnace equipment, scale is easy to accumulate and affect the cooling effect. In case of aging and crack of plastic water pipe, the equipment shall be replaced in time. When running in summer, using tap water well cooling is often prone to condensation. The use of circulating water system should be considered. When condensation is severe, the operation should be stopped immediately;

  3. Regularly replace or clean the key components of relevant equipment of medium frequency electric furnace

  4. Regularly overhaul the equipment

  The bolts of various parts of the equipment and the contacts of fastening contactors and relays shall be checked regularly. In case of looseness or poor contact, they shall be repaired and replaced in time. They cannot be used reluctantly to avoid major accidents.

  5. Regularly check whether the wiring of the load is excellent and whether the insulation is firm.

  The oxide scale accumulated in the diathermal induction ring shall be cleaned in time; If the heat insulation furnace lining has cracks, it shall be replaced in time; After the furnace lining is updated, the smelting furnace shall be checked carefully; The loads of insulated frequency conversion equipment are set at the work site, and the faults are relatively high, which are often ignored. Therefore, strengthening the protection of the load and avoiding the faults involving frequency conversion power supply is an important part to ensure the normal operation of the equipment.

  Article from:http://www.jtylgs.com

亚洲av伊人久久综合性色| 一边做一边说国语对白| 国产精品女丝袜白丝袜| 亚洲天堂av免费在线看| av在线免费播放网站| av免费看网站在线观看| 蜜桃在线观看视频在线观看| 国产伦精品一区二区三区在线| 日韩av天堂一区二区三区在线| 女人被狂躁的高潮免费视频| 精品人妻午夜一区二区三区四区 | aa日韩免费精品视频一| 免费久久99精品国产| 巨人精品福利官方导航| 亚洲中文有码字幕青青| 亚洲AV秘 无码一区二区三| 国产av黄色一区二区| 81久久免费精品国产色夜| 成人影院视频在线免费观看| 精品日韩一级免费视频| 亚洲乱码日产精品一二三| 成年午夜无码av片在线观看| 高清高速无码一区二区| 亚洲大胆美女人体一二三区| 亚洲一区二区三区,日本| 国产综合在线观看| 国产精品对白交换视频| 国产精品亚洲专区无码不卡| 亚洲综合一区二区三区蜜臀av| 亚洲成人一区二区av| 亚洲色图在线免费视频| 久久人人爽爽爽人久久久| 精品无码中文视频在线观看| 91久久国产情侣真实对白| 国产精品国产三级农村妇女| 女人18毛片aa毛片免费| 亚洲成av人在线观看网址| 国产va免费精品高清在线| 成人性生交大片免费看r| 国产三级黄色片子看曰逼大片| 日韩精品中文字幕第二页|